J. Fair PMP. PMI-SP. Mandeville LA. 70259 Petit Rd. (269) 340-4553 robertfair40@gmail.com Project Scheduler Accomplished and
versatile professional with 14+ years of experience optimizing operation and
profitability of companies within the Industrial Construction industry
through outstanding management, technical, and supervision expertise.
Tenacious and resourceful construction manager/ scheduler and skilled
boilermaker with proven ability to guide complex projects through their
entire life cycles including supervising work on Pump Stations, Compressor Station,
Pipelines, Condensers, Header removal, and Tube Wall removal with
installation. Articulate and collaborative communicator, negotiator, and
leader with talent for establishing productive relationships with clients,
colleagues, and government inspectors and building strong, motivated
construction crews of all crafts. CORE COMPETENCIES Power Plant
Construction Expertise • Project Management / Leadership • Boilermaker
Journeyman Multi-craft Team
Building / Leadership • Troubleshooting / Problem Solving • Safety Compliance Work Package
Modification • Quality Assurance / Control • Project Management Software AREAS OF
ACCOMPLISHMENT ● Power Industry
Expertise
– Built strong reputation as superb professional within power plant industry,
rising through ranks from Boilermaker Apprentice and Journeyman Boilermaker
to assuming leadership roles as Foreman, General Foreman, Superintendent,
Field Coordinator and Project Controls Manager. ● Client Relations – Demonstrated
ability to build trusting relationships with clients by being thoroughly
informed about proposal issues and priorities and clearly articulating goals,
objectives, and progress. ● Leadership and
Staff Development –
Proven track record for communicating and collaborating with trades people
from all crafts, motivating them to work as a team and perform at high
levels. ● Quick and Constant
Learner –
Determined to be best at profession, obtaining wide range of certifications
including PMP, PMI-SP, Boilermakers Project Management, Welding Inspection,
and OSHA 500 Instructor. Highly skilled in utilizing Primavera project
management software. SELECTED PROJECT
EXERIENCE USACE Project Manager / Scheduler.
United States Army Corps of Engineers, New
Orleans Nov 2014 – Present ●
Developed
and implemented standard cost, schedule and risk programs, processes and
practices to ensure Design and Construction projects were performed in
accordance with approved budgets and schedules. ●
Developed,
coordinated and maintained detailed project schedules for individual projects
and for the large multi-discipline project portfolios within Primavera
P6. Responsible for facilitating schedule development and maintenance
with the all the project stakeholders (i.e. engineering, licensing,
permitting, procurement, construction, etc.). ●
Analyzed
schedule tracking information and provided project teams with recommended
corrective actions to ensure projects meet required in service dates.
Prepared detailed schedule reports as required (i.e. critical path review,
baseline vs. actual, look ahead, milestones and reflection analysis). ●
Developed,
coordinated and maintained financial, schedule, estimate, budget, resource,
procurement and other data within P6 and other databases and query tools for
individual projects for the DP&C project portfolio. ●
Developed,
coordinated and maintained status reporting and executive dashboards for the
financial aspects and schedules for projects within Primavera P6, including
performance indices such as CPI, SPI, and other Key Performance Indices
(KPI’s). ●
Created
an Integrated, Resource Loaded, Cost Loaded, Physical Duration schedule built
in Primavera P6. This schedule’s scope has to do with three different
Pump Stations on the levees of New Orleans. The schedule is built from
Overhead budgets, original scope estimates, current contractor updated
construction schedule, and estimated modifications (Change Orders). The
data in Primavera was then generated to create custom reports along with EVM
(Earned Value Management) curves to accommodate FAR Requirements. Project Controls Manager, IRWIN Industries
Corporate, Denver
Colorado
Aug 2013 to Nov 2014 ●
Built
and maintained Primavera schedules for multiple projects. Schedules
were Resource and Cost Loaded. Reports were Earned Value, Three Week
Look ahead, Labor Resources, Cost Reports and other custom Reports created by
me. All schedules were for the Power Plant Division. Preliminary
schedules were built to assist in the “Bid Process”. ●
Responsible
for building schedules to support projects, spotlight issues, and provide
detailed analysis of available data. Developed estimates, and managed
budgets. Developed reporting mechanisms to measure performance,
efficiency and to forecast project outcomes. Project Controls Manager, Anclote Power
Station, Holiday Florida Jan-2013 to Aug-2013 ●
Planned
and Created Primavera P6 schedule for Anclote Power Station Unit 1.
Project consisted of Oil to Natural Gas Conversion with a Superheat
Modification. Schedule was resourced and cost loaded and updated
daily. Walk downs and various meetings were what contributed to the
schedule updates. Various reports were created for the customers status
updates. Client Prism DocAudit program used to update histories. ●
Review
the time/schedule portions of commissioning variation and prepare details and
analysis for resolution and/or inclusion in any response; ●
Maintaining
Earned Value Management (EVM) system and improving project schedule
performance and support to commissioning manager to manage scope of work ICP Analytics Project Planner. Tek
Systems June-2012 to Dec-2012 ●
Planned
6 projects for Data Movement for new ICP program. Built projects from
inception to resource loading along with cost loading in Primavera P6.
Produced various reports like Burn Rates, Resource Acclamations and Three Day
Look Aheads. Scheduler/Planner, Laramie River Station, Wheatland Wyoming,
Feb-2012 to June-2012 ● Updated
and altered Primavera P6 schedule for this spring outage. Work
consisted of 47 Burner Replacements, All Superheat replacement and
installation of an Over fire Air System, Much TM work was added to the
schedule and maintained Project completed on time and on
budget. Custom reports generated were Resource, Cost, and Earned Value. ● Calculating
CPI and SPI and Preparing Earned Value report for each Engineering,
procurement and construction phases. ● Implementing
project control plan and Capturing Earned Value methodology ● Defining
the work flow guideline for scheduling and project controls between all
parties Project Controls Manager, Eskom Power,
South Africa. Jan-2011 to Dec-2011 ● Wrote
a Primavera P6. 37 day outage on a LP Rotor Change Out. Built this
schedule from the WBS to activities. Resource loaded this schedule with
cost analysis. Showed Critical Path while the outage went through
its cycles. Attended outage meetings with a three day look ahead for
each contractor. This project was civil, construction, and
commissioning. ● Identifying
schedule and cost risks, and the critical and near critical paths and
preparing contingency management plans to maintain the project on time ● Developing
and maintaining valid and accurate bid and project schedules in Primavera P6. Planner/Scheduler, Gateway,
Suncoke, Granite City, Illinois June-2010 to Dec-2010 ● Responsibilities
dealt with collecting bids for plans written by myself and supplied to the
contractor. Mobilized contractor’s onsite and coordinated logistics,
materials, and submitted plant regulations for site safety training and
security requirements. This Outage consisted of five economizer
replacements on three HRSG units. Replacement of baffle plates, piping,
valves, and HRSG cleaning. All plans were put in Maximo and scheduled
in Primavera P6. This project was a construction maintenance outage. Field Coordinator, Will
County Power Station, Midwest Generation, Romeoville, Illinois
Jan-2010 to
May-2010
● Wrote
Work Orders in SAP and applied the Owners guidelines for the Contract.
Applied Work Orders to the outage schedule Primavera P6. Oversaw and
inspected craft work for Air Heater Basket Replacement, Tube Wall
Installation, Cooler Cleaning, Precipitator Repairs, Header Repair,
Scaffolding with much T&M work. Coordinated the contractor’s onsite
to maintain an even flow of production. During and at the end of the outage,
Initiated the Back Charge Process due to the contractors use of Plant Resources
not identified in the contract. This outage was on time and on budget with no
Safety Incidents. This project was a construction maintenance outage. Field Coordinator, Will
County Power Station, Midwest Generation, Romeoville,
Illinois
Sept-2009 to Dec-2009 ● Coordinated
the replacement of Air Heater baskets and the replacement of tubes around IR
ports in the SH and RH side of Unit #3 boiler. Installation of UREA
ports. Duties included updating the schedule Primavera P6 and wrote
scope work orders in SAP, monitoring Budget and delivering Back Charges to
contractors for the planned outage. Project on time and on budget. Zero
Safety Incidents This project was a construction maintenance outage. Field Coordinator, Fisk
Power Station, Midwest Generation, Chicago, Illinois
July-2009 to Sept-2009 ● Supervised
Siemens for work on Turbine repairs dealing with Mid Coupler. Completed
schedule according to baseline. This project was a construction maintenance
outage. Field Coordinator, Will
County Power Station, Midwest Generation, Romeoville, Illinois Feb-2009 to July-2009 ● Coordinated
Outage Activities set by the Contract Schedule with contractors. Duties
included updating the schedule (Primavera P6), monitoring Budget and
delivering Back Charges to contractors for the planned outage. Supervised and
inspected replacement of Tube Walls, Soot Blowers, and Coal Pipe.
Supervised and inspected repairs of leaks on a Steam Drum. This
outage was on time and on budget. Safety oversight. This project was a
construction maintenance outage. ADMIN
/ QUALITY CONTROL INSPECTOR, Scheduler. Comanche #3, APCOM Power, Pueblo,
Colorado Sept-2007
to Oct-2008 ● Completed
instrumentation and electrical scheduling on 750 Supercritical Boiler using
Primavera P5. Supervised all new hires, providing orientations and ensuring
urinalyses / random testing were conducted. Advanced to Quality Control
Inspector while maintaining scheduling duties. Instrumental in level
negotiations of Back Charges incurred by APCOM from XCEL Energy. This was a
New Construction Project. SUPERINTENDENT
/ MTG Power Station, Moorehead, Wheatland,
Wyoming May-2007
to
Aug-2007
● Supervised
rebuild of “Ash Hopper” and installation of Tube Walls and Dutchmen inside
boiler. Maintained schedule using Primavera P5. Followed Contract
Guidelines to deliver the high expectations required by the owner. This
project was a maintenance outage. SUPERINTENDENT,
Edwards Power Station, Enerfab, Peoria, Illinois
Feb-2007
to May 2007 ● Guided
installation of damper braces on all 4 corners of boiler and removal of
existing pipe. Supervised installation of Dutchman and supervised
installation of new hopper walls. Superseded owner’s expectations on
this TM project. This was a maintenance project. SUPERINTENDENT,
Clinton Nuclear Plant, Stone & Webster, Clinton, Illinois
Nov-2006
to Jan-2007 ● Coordinated
tear out and installation of GC Coolers and established crews to complete
work according to schedule. Supervised daily pre-jobs and completed work info
cards. Negotiated all Back Charges by the client. Project was complete
on time and on budget. This project was a maintenance outage. SUPERINTENDENT,
Palisades Nuclear Plant, Day & Zimmermann NPS, Covert, Michigan Jan-2006
to
Nov-2006
● Coordinated
boilermaker work for upcoming outage for condenser repair. Applied work to
required schedule, located and procured material and tools, and established
manpower. Main outage duties included boot-seal replacement in main
condenser. Project was completed on time and on budget. This project was a
maintenance outage. CONSTRUCTION
REPRESENTATIVE, Phyzer Distributing, Kalamazoo,
Michigan Sept-2005
to Dec-2005 ● Supervised
work on emission duct from boiler to newly constructed bag house. Procured
material in sequence to outage schedule (Primavera P5). Collaborated
with other contractors to complete tasks ahead of schedule. This project was
New Construction. GENERAL
FOREMAN, Palisades Nuclear Plant, Atlantic / URI, Covert,
Michigan June-2005
to Sept-2005 ●
Prepared
plans for outage work (Primavera P3). Applied activities to P5 schedule and
updated for daily outage meeting. Supervised work on containment
activities for outage and repair work on condenser. This project was a
maintenance outage. SUPERINTENDENT,
J.H. Campbell Plant, SCR Project, Babcock & Wilcox, West Olive, Michigan Jan-2004
to May-2005 ● Initiated
all prep work for site erection and assisted in setting up 56 modules ranging
from 200 tons and above in heavy rigging gang. Tracked the welding out of 56
modules. Schedule was in Primavera P3 that I updated daily. This
project was New Construction EDUCATION Villanova University Masters in Project Management San Diego State University San Diego CA. BS degree Guildford Technical Community College, Jamestown, North
Carolina Certificate Program in
Administration of Justice Completed Level 3 Police Academy TRAINING ●
Boilermakers Great Lakes Area Apprenticeship
Program (4-year Program). Became Journeyman. ●
PMI Member PMP PMI-SP. ●
International Boilermakers Project Management
School (PMI), Certified. ●
CWAI certified through AWS. ●
Rigging, Lead, Abatement, Supervisor, and
Asbestos training at several job locations. ●
Primavera P6 Basic through Advanced. ●
Microsoft Project 2010. ●
OSHA 500 Instructor Certification. ●
CPR / First Aid Training ●
TWIC Card ●
Microsoft Office Suite and Windows Operating
System 2013 ●
Proficient in Maximo ●
SAP experience at various Power Services |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |